Home

Network Engineer||Local candidates from CA at Remote, Remote, USA
Email: [email protected]
Title:                      Network Engineer

Client:                   Cedars Sinai Medical Center

Visa:                      USC,GC,GC-EAD                                                              

Location:              W
ill work at Cedars (LA) for 3 to 5 weeks to get familiar with the process. Then he/she would be shifted to Huntington (Pasadena)
, CA
until we finish. The primary refresh will finish sometime in May or June, Then he/she would return to Cedars to work on that project until it is complete some time in 2025 or after.

90% on-site. The schedule is quite fluid. I will describe a typical week.

Duration:             6 months could go longer

Interview:           Phone/Skype

Job description-

Vaxed, booster and flu shot required

to 10 years as a Network Engineer.  MUST have current Cisco Switch refresh experience

Layer 3 switching, strong OSPF and Spanning Tree Protocol (STP) are must haves for the switch refresh project.   

This is a Cisco Switch/Router refresh position for Hospital locations swapping out 10 to 12 year old switches/routers then configuring and installing new ones ( Cisco 9300's, 9410's, 9500's, 9606 core switches).

Cutovers for hardware refresh starts around 5pm, 7pm or maybe 9pm based on location.  Usually 5 hours long.  Manager said, moving 1 port at a time takes a while.

You'll work 1 night on/off and another Network Engineer will work the next night with 2 Technicians.  

During the day or night you'll do prep work for the next site you'll go to. 

This Network Engineer will have two Technician's that work with him/her.  

SPECIAL NOTE ABOUT INTERVIEW:
Director has a tech drawing on interviews asking candidates about OSPF protocols, layer 3 switching and Spanning Tree protocols (STP).   

LOCATION:
Upon initial engagement he/she will work at Cedars (LA) for 3 to 5 weeks to get familiar with the process. Then he/she would be shifted to Huntington (Pasadena) until we finish. The primary refresh will finish sometime in May or June, Then he/she would return to Cedars to work on that project until it is complete some time in 2025 or after.

90% on-site. The schedule is quite fluid. I will describe a typical week.

Monday prep work 9 to 5. But can be split shift.

Tuesday Switch Migration typically 10Pm to finish. But as 24X7 spaces are completed it can start earlier.

Wednesday prep work 9 to 5. But can be split shift.

Thursday - Switch Migration typically 10Pm to finish. But as 24X7 spaces are completed it can start earlier.

Friday - prep work 9 to 5. But can be split shift.

Sometimes we take a gap week which is all clean-up and prep. This would be day shift in most cases.

Regards:

Rekha Nainwal

Sr. Technical Resource Specialist

Email:

[email protected] || Direct:
984-201-7063
||Ext: 103

Cloud Quest LLC.

800 N King Street, Suite # 3042062, Wilmington, DE 19801

--

Keywords: information technology golang green card California Delaware Louisiana
[email protected]
View all
Wed Jan 10 21:10:00 UTC 2024

To remove this job post send "job_kill 1001414" as subject from [email protected] to [email protected]. Do not write anything extra in the subject line as this is a automatic system which will not work otherwise.


Your reply to [email protected] -
To       

Subject   
Message -

Your email id:

Captcha Image:
Captcha Code:


Pages not loading, taking too much time to load, server timeout or unavailable, or any other issues please contact admin at [email protected]
Time Taken: 1

Location: ,