Home

Power Platform Development- Remote at Remote, Remote, USA
Email: [email protected]
From:

sravan,

Unicorn Technologies LLC

[email protected]

Reply to:   [email protected]

Hi Folks 

Hope you are doing good 

kindly go through JD and share suitable profiles 

Role: Power Platform development

Remote

Don't share fake GC copies 

1-Location of Impact (Discussed previously and quoted approximately 2 weeks worth of design work)

Currently CMR stores the requested impacts from the applicant in the Request Impacts entity. CRM uses code to create an initial default permit impact location and permit requirement location. Impact location is needed at 3 levels: 1) request impact, 2) permit impacts, 3) request requirement. The data in CRM currently is not available at the request requirement level.

2- Requirement Location and Service Area

CRM currently uses requirement location and service area to define where the requirement needs to be mitigated. This needs to be refined and new data and fields added.

3-Credit Service Area

Currently, project assets have locations but do not have service areas. CRM only stores the projects location. The Pooled Credits pools use the projects location to establish the credit pools de facto service area. These credits may be used incorrectly if service areas are not properly defined.

4- Service Area Fee versus Requirement Location

5- Upgrade Refund Functionality

The refund functionality needs to be streamlined. When a refund is issued, either a negative revenue should be generated or a positive expenditure created. Neither occurs currently in CRM and a manual entry is made.

6- Credit Releases

Currently the credit release function can only be utilized after a credit release has been authorized. The proposed credit release, credit release ledger, and debit forms are all maintained in separate excel ledgers outside of CRM which need to change.

7-Cost Allocations to Service Area and mitigation type

DMS assigns all program costs including administrative costs to mitigation types and geographic regions. Currently none of this information is stored in CRM or NCAS. CRM assigns costs to projects, contracts, and funds/programs. On multi-credit projects, CRM doesnt know how much of the costs are assigned to the different mitigation types. These costs need to be assigned to a service area and broken down into mitigation types.

8- Revenue Upgrade

Currently the revenue entity captures all revenue for DMS however, it is unconnected and unlinked with customer invoices and vendor refunds.

9-RFP Entity

Currently RFP data and RFP results are tracked in an excel spreadsheet. The data is needed to assess the need for RFPs to acquire mitigation credits. The data is also needed to describe how prices (both awarded and not awarded) have changed in the market place.

10- Create STIP Entity

The IMS TIP module and data were not migrated from IMS to CRM. CRM has Projected Impacts as part of the Request module but there is no data available as the TIP entity was never created.

11-STIP Module Upgrade for Mitigation Targeting

When NCDOT submits mitigation orders to DMS, DMS tracks the mitigation order by TIP and categorizes it across three levels: forecasted projection, acceptance data, and permitted requirements. Currently, CRM can only provide permitted requirements or unmet permitted requirements for forecasting. Accepted data is not in format where it could be used and projection data is not yet stored.

12- Mitigation Target Tables

Mitigation Target tables are highly desired as these values determine snapshot program needs by service area and time. To create these, net assets, unmet requirements, and future requirements need to be known. Future requirements may be projection data, acceptance data, or requirements with a future due date.

13- Sum and Calculated Fields

CRM currently doesnt have many sum fields. Most of the data is entered in small pieces called lines. The user relies on charts to sum up the data. Unfortunately, charts only work when views have been added that allow the user to select the chart.

14- Data Validation / Data Cleaning

Perform Data validation / screening:

15-Reports

Various reports need to be created to extract data from the system.

16- Training and Project Documentation

Training and documentation of the system is important as changes to the system have been and are progressing at a rapid pace. DMS is requesting some training and documentations on the updates.

Thanks & Regards

Sravan Kumar

Technical Recruiter 

Unicorn Technologies LLC

4080 McGinnis Ferry Road, Suite 1305, Alpharetta, GA 30005

Direct: 470-480-4029 EXT: 121

[email protected]

www.unicorntek.com

Linkedin: https://www.linkedin.com/in/sravan-kumar-b20416177/

Keywords: information technology golang green card Delaware Georgia
Power Platform Development- Remote
[email protected]
[email protected]
View all
Tue May 14 20:46:00 UTC 2024

To remove this job post send "job_kill 1392773" as subject from [email protected] to [email protected]. Do not write anything extra in the subject line as this is a automatic system which will not work otherwise.


Your reply to [email protected] -
To       

Subject   
Message -

Your email id:

Captcha Image:
Captcha Code:


Pages not loading, taking too much time to load, server timeout or unavailable, or any other issues please contact admin at [email protected]
Time Taken: 2

Location: ,