Home

Looking for Sr Azure DevOps Architects at Remote, Remote, USA
Email: [email protected]
From:

SAM,

GITF

[email protected]

Reply to:   [email protected]

Requisition ID: 
FR104876

Estimated Duration: 
10/09/2023 - 01/31/2024

Requisition Name: 
Sr Azure DevOps Architects

Customer: 
OIT
1575 Sherman St., Denver   Denver,  Colorado    80203

Remote

Description

Period of Performance

The Trails Developer shall commence on or before 
October 09, 2023
 and continue through 
January 09, 2024
.

Purpose: Create an Enterprise-wide plan for data and agile work item migrations and implement the migration with a pilot team: CDHS Trails to adjust and refine it before distribution Enterprise Wide.

OIT has a central work item tracking tool for technical teams and is using it to improve and standardize process enterprise wide. Creating a standard migration path to this common tool will streamline the efforts by any team that requires a migration, thereby reducing cost and time needed.

Scope of Work

Migration of work items from CDHS (TFS) on-prem to OIT AzD per business requirements.

See Functional and Business Requirements.

Minimum Resource Requirements - Required

Familiarity with Azure DevOps migration tool options

Familiarity with Azure DevOps work items (area paths, etc)

Familiarity with TFS on-prem data, whether APIs or Direct SQL Data Access

Familiarity with basic script/code writing and rest API calls

Functional and Business Requirements:

Move Epics, features and user stories, including comment history and attachments

1)

Determine migration tool

a)

Research tool for import/export

b)

Considerations for choosing tool:

i)

How much customization would be needed to accommodate business requirements

ii)

Epics, Features, User Stories, Tasks and links must be maintained during migration (Maintain current hierarchy)

iii)

Maintain assignee during migration

iv)

Can discussion entries (a.k.a. Comments) be migrated over

v)

Links to other work items copied (other than hierarchy mentioned above)

vi)

Attachments

vii)

Migrate/map states (e.g. New, Committed, etc.)

viii)

Current custom fields

ix)

Tool must have some sort of logging that racks successful copying

2)

Determine migration scope

a)

Define which items need to be migrated

b)

Work in phases or full migration at once

3)

Map fields

4)

Historical data

a)

Define scope of how much history must be migrated

b)

How long does CDHS AzD need to remain available as read-only Are there audit requirements to consider

5)

Security Considerations

a)

Define and set security permissions, as well as any other security considerations prior to migration

6)

Training and Access Considerations

a)

Define training and set access permissions

7)

Perform Migration

a)

Migrate work items

Qualifications

Type 
Category 
Qualification 
Description 
Competency 
Required   
Skills 
Architecture 
AGILE - Agile Development Methodology 

Advanced (7-9 Years) 
No

Thanks & Regards,

Sameer Kumar

Global IT Family

Email:

[email protected]

www.globalitfamily.com

Skype:

sameer.satapathy

LinkedIn :

https://www.linkedin.com/in/sameer-satapathy-10ab0318/
 (Open to connect in Linkedin)

Connect with us!

Keywords: information technology Idaho
[email protected]
View all
Thu Sep 21 17:59:00 UTC 2023

To remove this job post send "job_kill 665193" as subject from [email protected] to [email protected]. Do not write anything extra in the subject line as this is a automatic system which will not work otherwise.


Your reply to [email protected] -
To       

Subject   
Message -

Your email id:

Captcha Image:
Captcha Code:


Pages not loading, taking too much time to load, server timeout or unavailable, or any other issues please contact admin at [email protected]
Time Taken: 0

Location: ,